Streamline the Permitting Process When Installing Charging Infrastructure for Medium- and Heavy-Duty EVs

Sponsored by:

The final step in preparing for the installation of EV charging infrastructure is to secure the necessary building permits to begin site construction. Learn about the process and requirements to obtain site permits, as well as the anticipated construction timelines.

Watch this webinar recording to gain insight into:

  • Permit application requirements including proposed site location, energy need and level of use, and equipment needs.
  • Common permitting issues and how to navigate any required site revisions.
  • Optimizing and expediting permit timelines.

This is the second installment of a two-part webinar series on designing and optimizing EV charging infrastructure. CLICK HERE to watch the recording for Webinar 1, “Design EV Charging Infrastructure to Fit Current and Future Deployments.”

Babeeta Nagra

Public Affairs Representative

PG&E

Allen Fong

Project Manager

PG&E

Enrique Rodriguez

Enrique M. Rodriguez

Associate Construction Analyst

Building Standards Commission of California

Brett Beard

EV Infrastructure Operations Director

Beard Electric EV